Edge Comfort
Commercial workspace — Building calculation

Calculate the building. Save the project. Issue the report.

Run an early public-building screen as a guest, or sign in as a Passive Edge internal user or authorized partner to unlock detailed engineering review, project saving and proposal-ready reports.

Step 01 — Climate

Where is the room?

Choose a country on the map, then refine by city.

European markets

Supported cities

Selected locationLondon · United Kingdom
10.0h

P90 climate fit: Conditional fit

10.0 night hours in London fall below a 24°C PCM phase point; 6 hours are required for recharge.

Step 03 — Your room

Commercial / public-building model

This dedicated workspace keeps building projects, authorization and reports separate from the residential Studio.

Open residential Studio

Can the AHU use cool outside air at night?

Public-building load & ceiling questionsRefine load

This changes transmission, solar and internal heat gains — not just floor area.

Step 04 — Supplemental cooling

Commercial and public-building active cooling remains subject to engineering review; a consumer portable AC is not added automatically.

Baseline case: no active room-cooling capacity is credited.

Model credit: 0 W room heat removal. PCM quantity is not reduced.

Step 05 — What do you already own?

Anything you own is marked “Reuse yours”. The rest gets “Partner pick” — never a forced bundle.

PCM usage and preliminary comfort screening appear only after this calculation. Engineering prices remain partner-quoted.

Step 02 — Thermal screening

Public calculation basis

P90 design warm dayERA5 2015–2024 · 24 hoursThe 90th-percentile daily peak, with night temperature and solar conditions from the same warm-day band.

One public model is used for every PCM quantity. It represents roughly the hottest 10% of warm-season days and is a decision estimate, not a performance guarantee.

Extreme multi-day heatwaves can prevent overnight PCM regeneration; active cooling is the correct fallback in that condition.

Complete the building information below, then calculate. PCM usage is hidden until that step.

Day and night speeds are controlled separately. Boost automatically returns to a lower mode after 2 hours.

Results wait for your inputs

The P90 climate basis is preset. Describe the building, then calculate.

PCM usage and preliminary comfort screening will appear after calculation. Engineering prices are confirmed by the local channel partner.

1 · P90 climate basis
2 · Building inputs
3 · Calculate